Stormwater News -  Lindenwood Drive

Following a winter shutdown, the Lindenwood Stormwater Project is scheduled to start up again the week of April 24th. Work will include the installation of a new storm drain down Lindenwood Drive, to bring stormwater to the newly constructed detention basin. The project will require closing the shared use path that connects from the end of Lindenwood Drive to Farrell Street Park.
Stormwater Lindenwood Drive